An existing 330 kV Transgrid transmission line (Wagga Wagga–Darlington Point) traverses the project site, offering an optimal grid connection point with minimal interface risk. The project includes an on-site high-voltage substation engineered for direct connection to the Transgrid network. A Connection Process Agreement has been executed, and the Connection Application is now well advanced in coordination with Transgrid’s network planning and system design teams.